
Application:
Removes epoxy coating (thickness: 0.7mm), which use for anti-corrosion, on concrete surface before reconstruction.
Preparation Method:
Removes tar or non-tar epoxy coating together with floating or peeled off spots.
Apply cutter with:
Applicable machine:
Performances:
6~10m²/hour;
4~5hrs/piece
*** The working performance or the cutter consumption may be carrying out differently according to the conditions of flooring materials, floor hardness, adhesiveness and etc at the job sites. ***