[Reinforced Earthquake-resistant Bridge Pier] Grinding concrete surface
Application:
Grinding and removing the contaminated and deteriorated concrete surface to strengthen the bonding of resin layer with concrete surface at bridge pier reinforcement construction jobsite.
Condition of concrete surface before construction
Preparation Method:
Grind the concrete surface to build out a hard and clean concrete surface.
Apply cutter with:
Dia Cup GOLD
Applicable machine:
HK-10H (Ultra Sander)HX-100 (Hyex Sander)
HK-10 / HK-12
Performances:
20~25m²/hour; 5~6hrs/piece*** The working performance or the cutter consumption may be carrying out differently according to the conditions of flooring materials, floor hardness, adhesiveness and etc at the job sites. ***