[Reinforced Earthquake-proof Bridge Pier] Removal of acrylic coating

Application:

Condition of acrylic coating wall before construction Condition of acrylic coating wall before construction

Removes acrylic coating to build out concrete base surface for construction of bridge pier reinforcement.

Preparation Method:

Handy Grinder HK-10H Handy Grinder HK-10H

Removes acrylic coating to build out concrete base surface.

Apply cutter with:

Ultra Cup  GOLD
NEO Ultra

Performances:

  • 10~15m²/hour;
  • 4~5hrs/piece
  • *** The working performance or the cutter consumption may be carrying out differently according to the conditions of flooring materials, floor hardness, adhesiveness and etc at the job sites. ***