HOME > Construction Cases > [Waterworks] Removal of epoxy coating

[Waterworks] Removal of epoxy coating

Application:

Removal of epoxy coating

Removes epoxy coating (thickness: 0.7mm), which use for anti-corrosion, on concrete surface before reconstruction.

Preparation Method:

Removes tar or non-tar epoxy coating together with floating or peeled off spots.

Removes tar or non-tar epoxy coating together with floating or peeled off spots.

Apply cutter with:

Ultra Cup  GOLD
NEO Ultra

Performances:

  • 6~10m²/hour;
  • 4~5hrs/piece
  • *** The working performance or the cutter consumption may be carrying out differently according to the conditions of flooring materials, floor hardness, adhesiveness and etc at the job sites. ***
test@linax.co.jp